JUST PLANNING
Description
The software for complete planning of the entire production chain. It optimizes your production performance through heuristic algorithms and “what if” simulations to identify the best scenario.
Features:
Production Chain Management
Planning the whole production chain of the company, even single or multi-site, with specific control function through an interactive drag&drop Gantt or Perth chart.
Identification of critical points
The historical analysis and the algorithms of just planning allow to find the optimal load of the machinery considering setting times, delivery dates, efficiency, priorities, etc.. being able to act also on the different parameters for each department.
Best Scenarios
The functionalities of the test environments allow users to simulate different scenarios, providing planners and management with more confidence in the decisions to be implemented before finalizing them on the production plans.
Procurement management
just planning can suggest the materials that need to be purchased, based on security stock and production order requirements. This means avoiding the complete exhaustion of the products in stock and therefore gain in efficiency.
Delivery time optimization
The system’s internal feasibility analysis allows planners to decide what can and cannot be done, considering all the possibilities. Receiving reports in real time is important to give full confidence to the sales office and increase customer satisfaction.
Diversifying planning
Different methods can be used for planning: finite capacity, finite capacity with lead-time, infinite capacity. Scheduling can be carried out even if materials are not available and, if necessary, a graphic marking will indicate the problem.