Datatex Consulting Srl

MCM - MQM MODULE

Description

MCM

MCM is a graphical capacity planning tool to coordinate and plan production in a better way and to provide tailored suggestions to the customer. It has to handle management and timing of the production process by verifying:

  • Machinery capacity

  • Materials availability, both in the warehouse and to the suppliers

  • Additional resources

  • Prefixed deadlines

MCM helps the company to solve many issues and analyzes bottlenecks. The main strength is the definition of a complete insight over all departments and a real integration with the system Datatex ERP TIM/NOW. In MCM all production requests, either coming from the ERP or entered manually, are prioritized and then placed on the Gantt. This can be done in either a finite capacity evaluation or an infinite capacity evaluation. Using finite capacity planning the system loads capacity based on a first-come, first-served approach and calculating the delivery date. Infinite capacity planning loads capacity based on requested delivery date and highlights the over-capacity bottlenecks and the planner determines the priority and delivery dates.

MQM

Either after capacity planning has occurred or as a step of capacity planning itself, the planning department must schedule production on a resource, either human or machine. The MQM module provides a graphical Gantt chart with user defined rules to make the scheduling process more accurate and more efficient, providing better results in less time.

MQM considers the planned start and end date of every step and presents this planning window to the scheduler, with machines color-coded to indicate best fit and also previously scheduled jobs color-coded to indicate opportunities to reduce setup time. The system dynamically calculates the setup time based on the sequence of product steps and characteristics of the products.

In addition to production resources, capacity, and date, the MQM system consider other constraints. The system can be configured to check material availability dates when scheduling, check future or subsequent production areas to ensure any overlap is within configured allowances, check non-capacity constraints such as tools or staffing levels to ensure the schedule is executable, and also consider the schedule dates of other products on the same order to ensure they complete within an acceptable amount of time of each other, among other considerations.

MQM also has an automatic sequencing capability. The schedule defines the rules, using heuristics to balance on-time delivery, setup cost implications and reduction of WIP. The system will automatically schedule all production that the rules allow and can be run in multiple iterations with loosening restrictions, if needed. Ultimately the remaining few production steps can be manually put on the Gantt chart by the scheduler.

When MQM is integrated to the ERP or shop floor data collection systems (manual or automatic), the schedule will be updated to reflect the reality of the production recording. This will alert the scheduler to jobs running late and the impact on subsequent jobs in the schedule, or the opportunity of moving production ahead due to more efficient processing.